Residential
project "Mission Villa Alliance" The implementation and design of this project was
given for the high demand for low cost housing in the country. It was divided
into three construction phases A, B, and C, occupying a total of 600 houses,
approx.
As the social housing was conceived using the minimum
required dimensions for habitation, and using traditional materials for the
construction of such housing, the facades were worked differently within each
stage.
Internship project - 6 |
Second and third stages of the design houses of social
interest, projected a total of 400 homes so to improve the neighborhoods of
"Antenna" and "El Palito Beach" located in Puerto Cabello,
Carabobo - Venezuela.
As the first stage the houses were designed with one
and two floors, according to the dimension and disposition of land given for
that purpose.